How to read a soil NCCPI (crop productivity score, 0 to 100) rating before buying land
By Landwise · Published
Try the free sample map with a real parcel in Johnston County, North Carolina. Open a parcel outline, compare the map with its source, and keep any missing answers on your checklist. The sample does not supply a survey, a soil test or a verified sale price.
A soil map helps you decide what to investigate. It cannot approve a septic system, establish a foundation design or guarantee that a parcel is buildable.
1. Draw an area of interest around the whole parcel
Open USDA NRCS Web Soil Survey and choose Start WSS. Locate the property, then draw an Area of Interest around its boundary. Compare that outline with your county parcel map; the soil tool's address location is not a legal boundary.
Landwise's USDA layer can help with screening, but use the official survey and local checks for the questions that affect your offer.
2. Read the map unit name and its share of the site
The Soil Map tab lists map units, symbols and acreage inside your selected area. A map unit may contain several soil components and smaller inclusions. The color at a point is a mapped interpretation, not a laboratory sample from that exact spot.
Review every unit touching your proposed home, driveway, garden or septic area. An average across the whole parcel can hide a small but important limitation.
3. Look at the properties that match your intended use
Use Soil Data Explorer for properties and interpretations. Read the rating explanation and limiting features, not just the color or a favorable label.
- Drainage class, ponding or flooding: investigate wet conditions and seasonal limits.
- Depth to a restrictive layer and water-table information: ask what it means for excavation and foundations.
- Slope and erosion: compare the proposed driveway and cleared areas with the ground itself.
- Septic interpretations: use them to plan questions for your local permitting office, not as a permit.
4. Read NCCPI (crop productivity score, 0 to 100) with its crop model and units
NCCPI (crop productivity score, 0 to 100) is USDA's National Commodity Crop Productivity Index. It describes relative inherent soil productivity for non-irrigated commodity crops. The version 3 guide describes corn, soybeans, small grains and cotton submodels. It is not a land price, timber appraisal, yield promise or home-site rating.
In Soil Data Explorer, find the NCCPI (crop productivity score, 0 to 100) interpretation and read its description, version, units and aggregation method. Compare ratings produced by the same method; do not assume a displayed number is a percentage yield or convert it to a 100-point scale without the report's documentation.
A parcel may span several map units and each unit can contain multiple soil components. Check the acreage of the units you plan to farm. A single parcel average can hide wet or steep ground. A missing rating is Not on record, not zero productivity.
5. Verify on site and keep the dated report
Export the official report, record its survey information and your area of interest, and keep the limitations with it. Soil boundaries and interpretations are not precise enough to replace an on-site evaluation.
Before an offer depends on septic, construction, drainage or crop suitability, ask the local health department and a qualified soil or engineering professional what testing is required. Write unresolved conditions into your due-diligence questions rather than assuming they pass.
Official sources
General research guidance, not a survey, appraisal, insurance quote or buildability determination. Confirm current records and local requirements before making an offer.